top of page
Zhe Wang
Life assessment of a rusted lock bridge
This lock bridge has been used since 2007. However,the humid environment results in the rust of the bridge.
We detected the the degree of corrosion of the bridge. Then a finite element model is built by ABAQUS on the basis of the detected data and engineering drawing of the bridge.
bottom of page